Sunninghill Construction

Sunninghill Construction Limited awards Avanti groundworks package for class room extension block and associated works at The Holy Trinity Primary School in Cuckfield, West Sussex.
  • Reinforced concrete pad and strip foundations with holding down bolts. RC Stairs.
  • Foul and Storm water drainage including installation of foul water rising main and pumping station.
  • Sub-Structure work including block and beam suspended and ground bearing floors.
  • Highway crossover and realignment of vehicle access including carriageway and footway construction, kerbing, drainage, tarmac and ‘grasscrete’ surfacing.
  • Service ducting and trenching.
  • External finishes and landscaping